欧美一区日韩一区,色是在线视频,亚洲一区电影,香蕉久久a毛片

CGNPC··EN Quick Access
Home Page > Business Overview > Fission Uranium Corp

Fission Uranium Corp (TSE code: FCU.TO) is one of the most successful exploration companies in the uranium ore industry. The Company has a large uranium ore project - PLS Project and the Triple R ore deposit, which is in urgent need of further development.

On January 27, 2016, CGN Mining Company Limited invested CAD 82.23 million to join 19.99% equity interests of Fission Uranium, and obtained 20% of sales rights of the off-take quantity of products for natural uranium and 15% of additional exclusive sales options.

Currently, the ore body found in the PLS Project is in east west direction, and from west to east there are R1515W, R840W, R00E, R780E and R1620E respectively, with the length of about 3.17km, it forms the longest high grade uranium ore metallogenic belt that has been found in Saskatchewan, Canada. And it is also one of the largest high grade uranium ore projects to be developed in the world. The current exploration result indicates that the PLS Project still has a high potential for resource growth in the future.

http://m.rouduner.com/cmsresources/f1/84/f7764bc547fbb2f14625355eaf34_1.0.png

Schematic Diagram of Distribution of Triple R Uranium Ore


Fission completed its winter exploration in June 2018. In this winter exploration, 36 wells were drilled and 6947m of exploration workload was completed. In addition, the exploration achievements include:

 (A) Make parts of inferred resources of R780 section transformed into controlled resources, making preparation for the pre-feasibility study report;

 (B) Expand the ore body scale of 1515W section;

 (C) Collect samples of engineering geological condition of the mining area

 At present, Fission has already carried out summer exploration. The total cost is estimated to be CAD 6.4 million, and a total of 147 wells (3425m) will be bored. The company aims to further upgrade the resource level of key mineralization area R780E, and it strives to complete the pre-feasibility study report before the end of the year.

Resources of the Project of  PLS

 

 

Controlled resources

Inferred resources

 

Project

Grade

Uranium (tons)

Grade

Uranium (tons)

1

PLS project

1.54

33,757

1.53

20,329

 


? 主站蜘蛛池模板: 建宁县| 九寨沟县| 宕昌县| 河北区| 鱼台县| 莎车县| 五华县| 策勒县| 平果县| 贵定县| 万年县| 邯郸市| 丽江市| 宁德市| 阿克苏市| 杂多县| 万年县| 平远县| 墨脱县| 呼伦贝尔市| 白玉县| 南和县| 屏南县| 铜陵市| 手游| 祥云县| 宁陕县| 柞水县| 玉门市| 西盟| 吉木萨尔县| 安宁市| 南江县| 普兰县| 噶尔县| 墨竹工卡县| 德庆县| 桐乡市| 太保市| 思南县| 合山市|